ISO 9001:2015 & AS9100D Certified

Zero-defect composite manufacturing protocols

Every prepreg batch, vacuum debulking sequence, and autoclave cure cycle is digitally logged and verified against stringent tensile modulus and resin density standards in our Taichung facility.

< 0.5%

void fraction threshold

100%

C-scan inspection rate

Class 10k

cleanroom layup standard

Fabrication sequence

Four-stage controlled production

01
02
03
04

Laser-Guided Ply Cutting

Controlled Vacuum Debulking

Precision Autoclave Curing

Ultrasonic C-Scan Testing

Automated nesting and laser projection ensure fiber orientation matches exact CAD vector coordinates without material distortion.

Multi-stage compaction cycles remove interlaminar volatiles and trapped air before components enter the pressure vessel.

Programmable thermal profiles manage ramp rates and pressure holds up to 7 bar for maximum matrix consolidation.

Non-destructive immersion scanning detects micro-voids, delaminations, and internal anomalies across complex geometries.

Metrology data

Verified mechanical thresholds

±0.05mm

CMM dimensional tolerance

62%

nominal fiber volume fraction

180°C

Tg high-temp epoxy matrix

Schedule an on-site Taichung plant audit

Procurement inspectors and quality engineers are invited to inspect our metrology lab, autoclave logs, and raw tow traceability records in person.